Bathroom renovation in Belgium
A bathroom is the most technical room in the home: water, waste, heating and ventilation meet on a few square metres. A successful renovation therefore does not start with the tiles, but with the survey, the layout and the pipework hidden underneath. Van Dijk Home fixes the technical base first, carries out waterproofing and pipework with interim checks, and only then moves on to tiling and sanitaryware.
- Final price given before we start
- Up to 2 years warranty on labour
- Emergency line available 24/7
- Direct phone contact: +32 2 000 00 00
Our method
Renovation in a fixed technical order
For every bathroom renovation we follow the same order: survey, fix layout, strip-out, pipework, waterproofing, tiles and sanitaryware. Planning stays predictable and we avoid work that must be opened up later.
- 01
Survey and fix the layout
We measure the room, the existing pipework and the connection points. From that we fix the new layout: where the shower, basin and toilet go, and which pipes must move to suit.
- 02
Strip-out and pipework
First comes strip-out, then new supply and waste runs with valves per circuit. Where pipes are still sound and in the right place, we keep them. A tightness test comes before the finish.
- 03
Waterproofing and ventilation
The floor and wet zones receive a waterproof membrane around the shower, corners and penetrations. We also check extraction of moist air so condensation cannot attack the new finish from behind.
- 04
Tiling and sanitary connections
Only when the technical base is right do tiles and the fitting of shower, basin, toilet and taps follow. We coordinate with tiler or electrician so nothing has to be opened up afterwards.
- 05
Testing and handover
Appliances are aligned, connected and tested by filling and emptying. At handover we go through valves, waste fall, ventilation and care of the sealed joints.
Technical core
Why a bathroom is more than tiles and appliances
Behind every bathroom, supply, waste, waterproofing and ventilation must work together. When they do not, leaks, standing water or moisture behind the finish appear, even if the tiles still look new.
A different layout often needs relocated pipes and a new waste fall. Without a survey first, that only shows once work is underway. That is why we fix the technical choices before strip-out and tiling.
In apartments, pipe noise control, access to the stack and building rules are added. Clean site organisation and a correct connection to the existing vertical runs remain central.
Related work
From partial works to a full renovation
Not every bathroom needs a full rebuild. Sometimes new sanitaryware, a tap or finding a hidden leak before you tile is enough. We match the next step to the scope of your project.
- Sanitary installation - fit shower, basin or toilet with a correct connection
- Sanitary appliance replacement - renew appliances on existing supply and waste
- Tap replacement - renew mixer or thermostatic tap
- Leak detection - locate a hidden leak before opening up or tiling
- Water pipe replacement - when pipework must be renewed structurally
Signals to watch
When a technical renovation makes sense
These signs show that the bathroom's technical base needs attention, not only the visible finish.
- Moisture, mould or failing joints around shower or bath.
- A shower floor where water stands or drains too slowly.
- A new layout where shower, basin or toilet change place.
- Taps or appliances that keep leaking despite local repairs.
- Condensation that lingers after showering from weak extraction.
- Suspicion of a hidden leak before you tile again.
Before we start
What to prepare before the survey
A short preparation makes the survey faster and the quote clearer. You do not need to strip anything yet.
- 01
Note layout and wishes
Write down whether shower, basin and toilet stay put or move. Mention if you are considering a walk-in shower.
- 02
Make the room accessible
Ensure we can reach existing connections, stopcocks and any access hatches. Clear loose items from the bathroom.
- 03
Gather photos or plans
Photos of the current layout and, if available, a floor plan help us judge waste runs and the stack.
- 04
Tell us apartment rules
In an apartment, mention working hours, water shut-offs and access to the shared stack.
Transparent pricing
What sets the price of a bathroom renovation
Installation on quote: we set the price after a visit on site.
Price depends on floor area, how much pipework must move and the appliances and finishes chosen. A bathroom that keeps its layout needs less opening-up than a full redistribution.
After the survey you receive a price indication covering labour, materials and coordination. You know where you stand before work starts. Call us for a first conversation, with no obligation.
Benefits
- Survey and technical layout settled before the first tile
- Work in a fixed order: strip-out, pipework, waterproofing, tiles, sanitaryware
- Waterproof build-up of floor and wet zones before tiling
- Waste fall and connection points checked per appliance
- Ventilation included against condensation and mould
Equipment & techniques
FAQ
Frequently asked questions
Question not on the list? We answer it by phone, no obligation.
+32 2 000 00 00How much does bathroom renovation cost?
Installation on quote: we set the price after a visit on site. Price depends on floor area, how much pipework must move and the appliances and finishes chosen.
How long does a full bathroom renovation take?
A typical full renovation often takes one to two weeks, depending on scope, floor area, condition of the pipework and the finish chosen. That is a guiding range, not a fixed guarantee. Drying time and tiling affect the programme. You receive a realistic phasing in advance.
Do the pipes always have to be replaced in a renovation?
Not always. During the survey we assess material, condition and position of the existing supply and waste. If they are still sound and in the right place, we keep them. We relocate or renew only when the new layout or the condition requires it.
Can a walk-in shower be fitted in every bathroom?
In most bathrooms yes, provided there is a correct waste fall and a waterproof floor build-up. On an upper floor we check the available build-up height. Where a classic fall is not feasible, a flat channel drain or a raised tray can offer a clean solution.
Why is ventilation so important in a renewed bathroom?
A bathroom produces a lot of moisture every day. Without good extraction of that air, condensation, mould and damage to joints or finishes appear. That is why we provide mechanical ventilation or correctly sized extraction together with the waterproofing.
Do you coordinate the whole project?
Yes. As plumber we take the sanitary and technical core and sequence the stages, from strip-out and pipework through to fitting the sanitaryware. Where needed we also coordinate with tiler or electrician.
Can a bathroom in an apartment be renovated?
Yes. In an apartment we allow extra for pipe noise control, access to the waste stack and building rules. Clean site organisation and a correct connection to the vertical runs remain central.
When should you call a plumber straight away?
Some signs are worth acting on straight away: a leak you cannot stop, water coming through a ceiling or a wall, a damp patch that keeps spreading, a sudden drop in pressure throughout the house, or water near a consumer unit or an electrical appliance. Close the main stop valve first: it limits the damage while the cause is being traced.
Present in Brussels, in Wallonia and in Flanders
42
cities served · plumbing
Click a marker to open your city page.
Cities we serve
Why Van Dijk Home
A bathroom’s lifespan depends on what lies beneath the tiles. We deliberately place survey, pipework, waterproofing and ventilation before the visible finish. Up to 2 years warranty on labour; parts carry the manufacturer’s warranty. You know which phase is running and when the bathroom is usable again.